摘要 结合工程实例,详细阐述了地下连续墙施工综合技术,从成槽设备到泥浆制备、槽段划分到钢筋笼吊装等方面进行了详细介绍,有效解决复杂地质条件下地下结构围护结构的施工难题,根据实际施工数据总结归纳了适合山西汾河一级阶地地下连续墙的综合施工技术,为同类工程提供参考和借鉴。 Combining with the engineering cases,the paper mainly illustrates the integrated construction techinque for the underground continuous walls,introduces from grooving equipment,slurry preparation,tank leaching,and hoisting of reinforced cages to solve the construction difficulties in the underground enclosure strucutre under the complicated geological conditions,and sums up the integrated construction technique for the second bottom underground continuous walls for Fenhe River in Shanxi Province,so as to provide some reference for similar projects.
作者 南耀琴 Nan Yaoqin(Shanxi Bajian Group Co.,Ltd,Taiyuan 030027,China)
出处 《山西建筑》 2020年第18期62-64,共3页 Shanxi Architecture
关键词 复杂地质 地下连续墙 施工技术 complicated geology underground continuous wall construction technique
  • 相关文献

参考文献5

二级参考文献7

共引文献22

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部