110kV变电站电气安装调试与优化管理研究 被引量:1

Research of Installation and Debugging,and Optimization Management of 110 kV Transformer Substation
下载PDF
导出
摘要 为满足人们对电力的需求,促进电力行业的发展,阐述了110 kV变电站安装与调试施工的重要性,分析了变电站安装调试技术的要点,包括变压器安装和接地网设计。提出了实现110 kV变电站电气优化管理的具体措施,即:完善岗位工作责任制度,提升安全操作意识,提升设备的维护和检查力度。 In order to satisfy the people’s electric demand and to promote the development of power industry,the research expounds the importance of installation and debugging construction of 110kV transformer substation,analyzes the key points of installation and debugging of transformer substation,including transformer installation and grounding grid.Specific countermeasures of optimization management of 110kV transformer substation are proposed,i.e.perfecting position work liability system,improving safety operation consciousness,and strengthening the maintenance and check of the equipment.
作者 徐磊 Xu Lei(State Grid Wuji County Power Supply Company, Shijiazhuang 052460, China)
出处 《黑龙江科学》 2020年第18期124-125,共2页 Heilongjiang Science
关键词 110 kV变电站 安装与调试 优化管理 110kV transformer substation Installation and debugging Optimization management
  • 相关文献

参考文献2

二级参考文献5

共引文献16

同被引文献3

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部