对某基坑渗漏的原因进行了分析,指出施工管理缺位和复杂的地质环境是造成渗漏的主要原因,在此基础上制定了补设高压旋喷桩、加强降水的渗漏处理方案,本基坑工程渗漏处理的关键点是降低地下水,可采用真空深井降水或者轻型井点降水代替自流深井降水,同时施工过程中应该加强止水帷幕的施工管理,可以为类似工程提供参考。
This paper analyzes the causes of leakage of a foundation pit and points out that the problems of construction management and complexity of geological environment are the main factors.Hence,a leakage treatment scheme is proposed by increasing high-pressure jet grouting piles and promoting dewatering.It has been highlighted that the key point of the leakage treatment technology for this foundation pit project is dewatering.As a result,vacuum deep well dewatering or light well point dewatering can be adopted to replace the deep-well dewatering.Meanwhile,the construction management of the waterproof curtain should be strengthened during the construction process in order to provide a reference for similar projects.
作者
刘恒新
沈华骏
岑仰润
赖小勇
LIU Heng-xin;SHEN Hua-jun;CEN Yang-run;LAI Xiao-yong(Hangzhou Geotechnical Engineering&Surveying Research Institute,Hangzhou 310012,China)
出处
《地基处理》
2020年第4期347-350,共4页
Journal of Ground Improvement
关键词
渗漏
止水帷幕
高压旋喷桩
井点降水
leakage
waterproof curtain
high-pressure jet grouting pile
dewatering