摘要
以毗河供水一期工程新生灌区第四流量段村子湾隧洞为例,详细介绍了小断面、长距离隧洞快速衬砌施工的方法并对此进行了分析,可为相同条件下的类似工程施工提供参考。
Taking the Cunziwan Tunnel in the 4th flow section of Xinsheng Irrigation District of Pihe Water Supply Phase I Project as an example,the rapid lining construction method of long tunnel with small section is introduced and analyzed in detail,which can provide reference for similar engineering construction under the same conditions.