摘要
斐济国的设备物资技术标准均参照澳大利亚和新西兰等发达国家的要求。结合斐济瑞瓦河供水工程设备物资国内(国内是指“中国国内”)采购的保障与管理,介绍了国际项目设备物资国内采购保障的要求及注意事项,以及设备物资在国内采购过程中取得的一些经验总结,可为其他国际工程项目设备物资国内采购提供参考。
The technical standards of equipment and materials in Fiji refer to the requirements of developed countries such as Australia and New Zealand.Combined with the guarantee and management of domestic procurement(domestic refers to"China")of equipment and materials at Rewa River Water Supply Project in Fiji,this paper introduces the requirements and precautions of domestic procurement guarantee of equipment and materials for international projects,and summarizes some experience obtained during the process of domestic procurement of equipment and materials,which can provide reference for domestic procurement of equipment and materials for other international projects.
作者
晋如勇
王军杰
JIN Ruyong;WANG Junjie(Equipment & Material Dept., Sinohydro Bureau 10 Co., LTD, Chengdu, Sichuan, 610072)
出处
《四川水力发电》
2020年第4期86-89,共4页
Sichuan Hydropower
关键词
国际工程项目
采购保障
管理
斐济瑞瓦河供水工程
international project
procurement guarantee
management
Rewa River Water Supply Project in Fiji