摘要
本文分析了国内某垃圾焚烧发电厂孤网改造及试验情况,实现了外部电源中断后保障设备安全、快速恢复并网功能,并根据孤网试验提出优化整改建议,可为同类型发电厂提供参考。
This paper introduces and analyzes the transformation and test of the isolated power grid of a domestic waste incineration power plant,which can ensure the safety of the equipment and quickly restore the grid connection function after the external power supply interruption.According to the isolated network test,the optimization and rectification suggestions are put forward,which can provide reference for similar power plants.
出处
《电力系统装备》
2020年第16期61-62,共2页
Electric Power System Equipment
关键词
孤网
垃圾焚烧
设备安全
快速恢复
isolated network
waste incineration
equipment safety
rapid recovery