摘要
10kV开闭所工程中,大功率空调的电源线大多是护套线,不配插头。施工中,通常会自行配置插座和插头,那么对其接线的好坏将直接影响到空调使用和设备安全。本文以开闭所空调插座、插头烧坏,导致所用变高压侧熔断器熔断为例,简单探讨其过程。
In engineering,the power cords of high-power air conditioners are mostly sheathed cords without plugs.During construction,sockets and plugs are usually configured by themselves,so the quality of their wiring will directly affect the use of air conditioners and equipment safety.This article takes the blowout of the socket and plug of the air conditioner at the switchgear station,which leads to the blowout of the high-voltage side fuse used as an example,and briefly discusses the process.
作者
刘川平
郝兴宏
许江波
Liu Chuan-ping;Hao Xing-hong;Xu Jiang-bo
出处
《电力系统装备》
2020年第16期114-116,共3页
Electric Power System Equipment
关键词
短路
空调插座
熔断器
熔断过程
short circuit
air conditioner socket
fuse
fusing process