大型山地光伏电站的电气故障排查与处理 被引量:3

下载PDF
导出
摘要 建设大型山地光伏发电项目的主要特点有建设面积大、布置分散、施工难度大等,导致项目建设完成后,施工质量问题频发,电气故障较难排查处理,从而影响光伏电站发电量,因此提出一套系统的故障解决方案及预防措施,对于在建项目及已建项目的质量把控,有重要意义。本文对光伏电站存在的电气故障问题进行汇总分析,探讨故障的根本原因,并针对光伏发电场区常见的电气故障进行梳理形成一套完整的处理方案及预防措施,给已经建成的电站提供故障解决方案参考,并在新建光伏发电项目中予以避免。本方案已在某100MW大型光伏电站中得到了应用,并取得了理想的效果。 The construction of large photovoltaic power generation project construction of the main features of mountain area is large,scattered layout and construction is difficult,and so on,After the project was completed,construction quality problems occur frequently,and it is difficult for electrical fault screen processing.thus affecting photovoltaic power generation,therefore puts forward solutions to a set of system failure and preventive measures,for the quality of construction projects and projects have been built to control,has important significance.In this paper,the photovoltaic power station electrical fault problems of summary analysis,discusses the root cause of the failure,and photovoltaic power generation of the common electrical failure,especial comb form a complete set of treatment schemes and preventive measures,the plant has been built to provide fault solution for reference,and in new photovoltaic power generation project to be prevented.This scheme has been applied in a 100MW large-scale photovoltaic power station,and the ideal effect has been achieved.
出处 《科学技术创新》 2020年第29期142-145,共4页 Scientific and Technological Innovation
关键词 山地光伏发电 电气故障 发电量 太阳能 Mountain photovoltaic power generation Electrical fault Power generation The solar energy
  • 相关文献

参考文献14

二级参考文献89

  • 1王飞,余世杰,苏建徽,沈玉梁.太阳能光伏并网发电系统的研究[J].电工技术学报,2005,20(5):72-74. 被引量:183
  • 2刘加平,杜高潮.无辅助热源被动式太阳房热工设计[J].西安建筑科技大学学报(自然科学版),1995,27(4):370-374. 被引量:19
  • 3[1]European Wind Energy Association and Greenpeace. Wind force 12-A blueprint to achieve 12% of the world's electricity from wind power by 2020[M]. Belgium: European Wind Energy Association, 2001.5~71
  • 4[2]杜白石.风能与热利用[M]. 西安:西安地图出版社,1997. 138~141
  • 5牛山泉.冬季寒冷地带のエネルギ需要に适合[J].日本の科学と技术,1986,27(5):48-55.
  • 6[5]王保国,黄虹宾.叶轮机械跨音速及亚音速流场的计算方法[M].北京:国防工业出版社,2000.219
  • 7[7]Novak P, Ekelund T. Modeling and control of variable-speed wind turbine drive system dynamics[J]. IEEE Control System,1995,15(4):28~38
  • 8[9]牛山泉. 风车工学入门[M]. 东京:森北出版株式会社,2002.174~181
  • 9张健,周文和,丁世文.被动式太阳房供暖实验研究[J].太阳能学报,2007,28(8):861-864. 被引量:9
  • 10贺德馨,张维智.风力机翼型大攻角气动性能手册[Z].中国空气动力研究与发展中心,1989.

共引文献139

同被引文献21

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部