期刊文献+

Optimization of Flow Matching Schemes for a Heavy Gas Turbine Burning Syngas 被引量:1

原文传递
导出
摘要 A heavy-duty gas turbine,designed for natural gas,was used to bum the syngas with two different calorific values.This study was mainly to optimize the flow matching scheme for the gas turbine.Two models of gas turbine burning syngas with different calorific values were established and the calculation models of different flow matching schemes were provided.The optimum scheme was obtained by evaluating thermal efficiency and work output under different operating conditions.The results showed that the highest unit efficiency was achieved by,without significant drop in work output,increasing the throat area of the turbine nozzle and reducing the initial temperature of the gas.On the premise of ensuring the safety of the gas turbine unit,increasing the pressure ratio of the compressor could further improve the unit efficiency and the work output.Simply adjusting the angle of the inlet guide vane fails to match the flow of compressor and turbine.The measures such as reducing inlet temperature of turbine or air bleed still need to be adopted,but the thermal efficiency dropped significantly in this process.
出处 《Journal of Thermal Science》 SCIE EI CAS CSCD 2020年第5期1292-1299,共8页 热科学学报(英文版)
基金 This work was support by the National Natural Science Foundation of China(Grant No.51976214 and No.51576193) National Science and Technology Major Project(2017-V-0010-0001 and 2017-IV-0100-0047).
  • 相关文献

参考文献5

二级参考文献41

共引文献56

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部