以某深水半潜式生活平台的大型可伸缩式海工栈桥的码头试验(即栈桥安装到平台之后的试验)为参考对象,根据海工栈桥的功能特点,结合相关法规和船厂资源,介绍码头试验的内容和方法。
The gangway test on board of a deep-water semi-submerged platform(that is,the test after the gangway was installed on the platform)was taken as the research object.Basedon function of offshore gangway,relevant regulation and facilities of shipyard,the contents and method of gangway testswere introduced,providing references for similar projects to solve difficulty in the tests and save cost.