摘要
针对基坑周边既有隧道,为了研究深基坑施工阶段的开挖对附近隧道及基坑本身的影响,采用midas GTS NX软件对三维深基坑施工阶段进行分析。分析结果表明:基坑支护结构桩顶最大水平位移、桩顶最大竖向位移、围护桩深层最大水平位移等均满足规范要求;隧道结构最大沉降为0.8mm,隧道结构最大沉降差为0.6mm,均满足规范要求。
For both around the tunnel,midas GTS NX software was used to analyze the 3D deep foundation pit in order to study the phase of the construction of foundation pit excavation of tunnels and foundation pit near itself and the effect.The results of study showed that the foundation pit supporting structure of the maximum horizontal displacement of pile head,the maximum vertical displacement of pile top,the deep maximum horizontal displacement of retaining piles can satisfy the requirements of specification and the maximum settlement of tunnel structure was 0.8mm,and the maximum settlement difference of tunnel structure was 0.6mm,which all met the requirements of specification.
作者
于旭光
曹伟伟
YU Xuguang;CAO Weiwei(Tangshan Polytechnic College,Tangshan 063299,China)
出处
《工业技术与职业教育》
2020年第3期18-21,共4页
Industrial Technology and Vocational Education
基金
2019-2020年度唐山工业职业技术学院院级课题“软土地区深基坑开挖引起地层动态变形的研究”(课题编号:YJKT201966),主持人曹伟伟。
关键词
三维基坑
隧道
基坑支护结构
隧道结构最大沉降
3D deep foundation pit
the tunnel
foundation pit supporting structure
maximum settlement of tunnel structure