摘要
为使三峡库区部分污水处理厂出水水质达到标准,利用BioWin模型软件建立了三峡库区木洞镇污水处理厂处理工艺数学模型,评估了该污水处理厂运行状况并提出了改造方案。结果表明:①BioWin模型软件能够较为准确地模拟污水处理厂实际工艺运行状况;②由于碳源不足使得反硝化反应不充分,导致该污水处理厂TN去除效率较低;③在保持其他工艺条件不变的情况下,将内回流由3900 m 3/d调整为14000 m 3/d后,污水处理厂的TN去除效率提升了11.66%,出水水质从一级B排放标准提升至一级A排放标准。
In order to make effluent quality of some sewage treatment plants in the Three Gorges Reservoir Area to conform the national standard,a mathematical model of sewage treatment process of Mudong Town sewage treatment plant was established by BioWin software.Then,operation status of the sewage treatment plant was evaluated and some improving schemes were proposed.The results showed that:①BioWin software could be used to simulate actual process status of sewage treatment plants.②Low removal efficiency of TN was related to inadequate denitrification that resulted from lacking carbon source.③If not changing other processes,the TN removal efficiency could be increased by 11.66%,and the effluent quality reached Grade I-A Discharge Standard from Grade I-B after increasing the internal reflux from 3900 m 3/d to 14000 m 3/d in the sewage treatment plant.
作者
陈佳
唐燕秋
周谐
陈建
CHEN Jia;TANG Yanqiu;ZHOU Xie;CHEN Jian(Engineering Research Centre for Waste Oil Recovery Technology and Equipment of Ministry of Education,Chongqing Technology and Business University,Chongqing 400067,China;Chongqing Academy of Ecology and Environmental Sciences,Chongqing 401147,China;Chongqing Ecology and Environmental Monitoring Center,Chongqing 401147,China)
出处
《人民长江》
北大核心
2020年第9期39-44,168,共7页
Yangtze River
基金
科技部港澳台科技合作专项项目(2014DFH90030)。