摘要
随着新奥法在隧道施工中的广泛应用,作为其关键环节的监控量测所处的地位越来越重要。本文以科洞Ⅰ号隧道现场监控量测数据为例,通过数据分析准确预测了右线YK74+276里程处发生的坍塌事故,阐明了监控量测工作在塌方预报中所起到的重要作用;运用一元非线性回归分析法对拱顶下沉数据进行回归分析,根据分析结果并结合围岩压力量测数据提出了施工二次衬砌的合理时间在40d左右;通过监控量测数据的分析,实时掌握了围岩及支护的稳定状态,并据此对施工设计参数提出修改意见。
With NATM widely used in tunnel construction,tunnel monitoring measurement as its crucial link plays an increasingly important role.This article takes the monitoring measurement field data of Ke DongⅠtunnel as practical examples.The author accurately predictes the rock collapse which occurred at the YK74+276 mileage of the right line through data analysis,thus illustrates the important role for rock collapse forecasting played by monitoring measurement,then,uses the method of unitary nonlinear regression analysis to analyze the crown settle data,according to the analysis results and combining with surrounding rock’s pressure data,ascertains the construction time of the secondary support is forty days later,meanwhile,the research work can obtain the stability informations of surrounding rock and support timely through the analysis of monitoring data and then proposes amendments on the design parameters.
作者
李本召
朱斌
黄传计
武强
LI Benzhao;ZHU Bin;HUANG Chuanji;WU Qiang(Engineering Research Center for Non-Ferrous Metals Mineral Exploration of Henan Province,Zhengzhou 450016,Henan,China;The Fifth Geological Brigade of Henan Bureau of Geology and Mineral Resources for Non-ferrous Metals,Zhengzhou 450016,Henan,China;Guilin Unwersity of Technology,Key Laboratory of Geological Engineering Centre of Guangxi Province,Guilin 541004,Guangxi,China;Guilin University of Technology,College of Earth Sciences,Guilin 541004,Guangxi,China;China Unwersity of Mining&Technology(Beijing),College of Geoscience and Surveying Engineering,Beijing 100083,CAina)
出处
《矿产勘查》
2020年第9期2038-2044,共7页
Mineral Exploration
基金
广西地质工程中心区重点实验室自主研究课题
国家自然科学基金项目(编号:40572149)和国家自然科学基金项目(编号:40772162)联合资助。
关键词
新奥法
监控量测
塌方预警
回归分析
二次衬砌
NATM
monitoring measurement
rock collapse warning
regression analysis