2Gela G,Hotte P,Charest M.IEC method of calculation of minimum approach distances for live working[J].IEEE Transactions on Power Delivery,2000,15(2):635-640.
3Kientz H.Tutorial for the derivation of live-line minimum approach distances for the 1993 edition of the national electrical safety code[A].The Sixth International Conference on Transmission and Distribution Construction and Live Line Maintenance[C].Nevada:IEEE,1993.7-35.
4Nakashima M,Yakabe H,Maruyama Y.Application of semi-automatic robot technology on hot-line maintenance work[A].IEEE International Conference on Robotics and Automation[C].Japan:IEEE,1995.843-850.
5Yano K,Maruyama Y,Morita K,et al.Development of the semi-automatic hot-line work robot system "Phase Ⅱ "[A].The Seventh International Conference on Transmission and Distribution Construction and Live Line Maintenance[C].Ohio:IEEE,1995.212-218.