期刊文献+

韩榕练水系连通乌石拦河闸引水工程的设计探讨 被引量:1

Discussion on Design of Water Diversion Project Connecting Hanronglian River System with Wushi Sluice
下载PDF
导出
摘要 乌石拦河闸引水工程是韩江榕江练江水系连通工程的子工程之一,是改善练江流域水环境污染、水生态破坏等问题的水系连通工程。韩江榕江练江水系连通乌石拦河闸引水工程中夏地分干渠渠道的改造及整治中,设计保留现有渠道,仅对其清淤、扩容等进行优化设计,以满足对练江流域生态补水的需要,同时改善了自然环境,可为以后类似设计提供参考。 Wushi Sluice Water Diversion Project is one of the sub-projects of the Hanjiang-Rongjiang-Lianjiang water system connectivity project,which is a water system connectivity project to improve the water environment pollution and water ecological damage in the Lianjiang River Basin.Existing channels are retained for the design during reconstruction and renovation of Xiadifen Main Channel in the water diversion project connecting Hanjiang-Rongjiang-Lianjiang river system with Wushi Sluice.Desilting,capacity expansion and other aspects are optimally designed,thereby meeting the ecological water supplement needs of Lianjiang river basin.Meanwhile,the natural environment is improved,thereby providing reference for future similar design.
作者 曾辉强 ZENG Huiqiang(Guangdong Water Conservancy and Electric Power Survey and Design Institute, Guangzhou 510635, China)
出处 《中国水能及电气化》 2020年第8期29-31,5,共4页 China Water Power & Electrification
关键词 水系连通 引水工程 设计 connection of water system water diversion project design
  • 相关文献

同被引文献15

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部