摘要 江南工作井超深基坑工程临近长江且近接既有青奥隧道综合体,为确保降水方案满足开挖要求,在正式开挖:土方前,进行现场预降水试验,以指导后期开挖过程中的降水方案。分析可知,基坑内及两墙间降水对坑外水位影响较小,表明基坑止水帷幕质量较好,获取的降水参数和试验数据可指导后期土方开挖过程中的降水施工。 The Jiangnan working well ultra-deep foundation pit project is close to the Yangtze River and close to the existing Youth Olympic Tunnel Complex.To ensure that the precipitation plan meets the excavation requirements,a field pre-dewatering test is carried out before the earthwork is officially excavated to guide the subsequent excavation process Precipitation scheme.The analysis shows that the dewatering in the foundation pit and between the two walls has little effect on the water level outside the pit,indicating that the quality of the water-stop curtain of the foundation pit is good.The obtained precipitation parameters and test data can guide the dewatering construction in the later earth excavation process.
作者 李丹 杨涛 车灿辉 武文清 童立元 LI Dan;YANG Tao;CHE Can-hui;WU Wen-qing;TONG Li-yuan(Nanjing Urban Public Project Construction Center,210019,Nanjing,China;School of Transportation,Southeast University,210019,Nanjing,China;Nanjing Darcy Geotechnical Engineering Co.,Ltd,210019,Nanjing,China;China Railway 3th Bureau Group,250000,Jinan,China)
出处 《建筑技术》 2020年第9期1063-1066,共4页 Architecture Technology
关键词 超深基坑 预降水试验 止水帷幕 ultra-deep foundation pit pre-precipitation test curtain for cutting off water
  • 相关文献

参考文献2

二级参考文献10

共引文献52

同被引文献19

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部