文章从工期、可操作性、经济效益等方面,对茨淮新河跃进沟涵加固工程降排水多种施工方案进行分析对比,选择最优方案以解决降水和排水问题。
Based on construction period,operability etc.comparison on several plans about dewatering and drainage construction of reinforcement project of the Yuejin Ditch underground culvert are given.The best plan is chosen for solving the problem of dewatering and drainage.