摘要
以C#语言为开发背景,结合太平驿水电站电量计算的实际现状,采用先进的编程思想和Excel二次开发方式,对太平驿水电站的电量日报进行计算,避免了人工计算存在的人为错误,节约运行成本,同时为电站的电量统计提供有效的技术支持,具有较好的实用价值和推广意义。
Based on the background of C#language and combined with the actually condition of electricity calculation for Taipingyi Hydropower Station,we used advanced programming thinking and Excel secondary development method,calculated the daily report of electricity in Taipingyi Hydropower Station.We avoided errors made by human calculation,saved operating cost,and produced technic support of electricity in this power station.This paper has good practical value and promotion significance.
作者
赵栋栋
丁岳峰
徐军
杜孝军
ZHAO Dong-dong;DING Yue-feng;XU Jun;DU Xiao-jun(Sichuan Huaneng Taipingyi Hydropower Co.,Ltd.,Chengdu 610000,China)
出处
《水电站机电技术》
2020年第9期12-14,67,71,共5页
Mechanical & Electrical Technique of Hydropower Station
关键词
太平驿水电站
电量计算
EXCEL二次开发
电量统计
Taipingyi Hydropower Station
Electricity calculation
Excel secondary development
Electricity statistics