废钢预热型电炉炼钢厂废钢供应能力的确定 被引量:1

Determination of Scrap Supply Capacity of Preheating EAF Steelmaking Plant
下载PDF
导出
摘要 从满足带水平输送段废钢预热电炉生产要求出发,提出了废钢供应能力主要参数及其确定方法,并给出冶炼周期42min的140t电炉废钢供应能力的计算过程及结果,同时给出了不同吨位带废钢水平输送段电炉的电磁盘起重机配置数量和是否设置履带机等废钢上料设备的建议。 Scrap supply main parameters and their design method is proposed for meeting production requirements of a scrap-preheated EAF with a horizontal transport section.Calculations and results are exemplified for a 140-t EAF’s scrap supply capacity with a tap-to-tap cycle time of 42 minutes.Recommendations are rendered for the magnetic-disc crane configuration for EAFs of different tonnages and equipped with horizontal transport.The necessity for installing a caterpillar conveyor for scrap charging is also advised.
作者 刘春霆 廖远 刘书忠 周懿 LIU Chunting;LIAO Yuan;LIU Shuzhong;ZHOU Yi(CISDI Engineering Co.Ltd.,Chongqing 401122,China;Steel-making Plant 2 of Shanxi Taigang Stainless Steel Co.Ltd.,Taiyuan 030003,China;CISDI Chongqing Information Technology Co.Ltd.,Chongqing 401122,China)
出处 《工业加热》 CAS 2020年第9期26-28,共3页 Industrial Heating
关键词 电弧炉 水平废钢输送段 废钢供应能力 EAF horizontal transport section scrap supply capacity
  • 相关文献

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部