摘要
本文介绍了依据GB 4943.1-2011,为试验检测标准的检测实验室从最初的基础建设到取得CNAS认可的全过程标准化工作的实施。基础建设期包括科室的配置及环境的要求、电力布线的要求、防静电要求、照明要求、通风要求、防护要求等。实验室的能力认可路线采用体系建立和试验能力建设同步实施的路线开展,在建设路线上分为:管理路线、技术路线。
This article describes the implementation of GB 4943.1-2011 as the basis for the test standard for detection of the entire standardization process of testing laboratories from the initial infrastructure to get CNAS accreditation.The initial infrastructure period includes the configuration and environmental requirements of the testroom;the requirements of power wiring;anti-static requirements;lighting requirements;ventilation requirements;protection requirements,etc.The laboratory's ability recognition route is carried out by the route of simultaneous implementation of system building and test ability development.The construction route is divided into management route and technical route.
作者
汲亚娟
杨先龙
林舒
刘聂
边明松
JI Ya-juan;YANG Xian-long;LIN Shu;LIU Nie;BIAN Ming-song(Sichuan Energy Internet Research Institute,Tsinghua University)
出处
《中国标准化》
2020年第10期204-207,共4页
China Standardization
关键词
检测实验室
基础建设
能力认可
标准化
testing laboratory
infrastructure construction
capability recognition
standardization