摘要
针对大型航站楼设计方案选择时,建设指挥部、使用部门、设计单位三方关注的侧重点不同、意见可能不一致的痛点问题,以某航站楼3个10 kV配电系统及开关站设置方案、航站楼配电房不同进出电缆敷设方式,以及航站楼应急照明和疏散指示系统设计方案的比较和选择为例,提出由受影响最大的一方来主导方案的选择,以期提供兼顾各方的最优方案选择思路。
In this paper,taking the setting scheme of three 10 kV power distribution systems and switch stations,different methods of cable laying in and out of distribution room,comparison and selection of design scheme of emergency lighting and evacuation indication system of a terminal as an example,the idea of optimal scheme selection dominated by the party most affected so as to take into account all parties is put forward in terms of different focuses and possible disagreement of construction headquarters,use departments,designers when choosing design schemes of a large-scale terminal.
作者
侯剑
HOU Jian(China Southwest Architectural Design and Research Institute Corp.Ltd.,Chengdu 610042,China)
出处
《建筑电气》
2020年第9期87-92,共6页
Building Electricity
关键词
航站楼
强电设计方案
10
kV配电系统
开关站设置
敷设方式
应急照明及疏散指示系统
疏散方向标志灯
视觉连续
terminal
strong current design scheme
10 kV distribution system
setting of switch station
laying methods
emergency lighting and evacuation indication system
evacuation direction marker lights
visual continuity