期刊文献+

辛置矿10-430B采面区段平巷破碎段控制与治理实践 被引量:2

Control and treatment practice of crushing section of entry in 10-430b mining face section of xinzhi mine
下载PDF
导出
摘要 为解决辛置煤矿东四采区10-430B采面运输平巷过断层群围岩破碎、大变形破坏难题,以矿山岩体力学和围岩耦合支护理论作为指导,在对采面地质条件分析基础上,通关“预注浆+锚网+锚索”多种联合支护方案,在平巷内形成多层结构体系,不仅提高了围岩自身承载性,还较好的减少了巷道大变形以及返修工程量。 to solve the symplectic buy 10-430-b on grabbing the mining area of coal mine haulage roadway through fault group of crushing,large deformation of surrounding rock damage with mining rock mass mechanics and rock mass coupling support theory as the guidance,based on the analysis of geological conditions of the mining surface,customs clearance"pre grouting,anchor net and anchor cable"a variety of combination supporting scheme,in the entry form a multilayer structure system,not only improved the surrounding rock self-bearing sex,also better to reduce the large deformation of roadway and the repair of quantities.
作者 申亚峰 SHEN Yafeng(Huozhou Coal-Electricity Group Company Xinzhi Coal Mine,Huozhou 031412,China)
出处 《煤矿现代化》 2020年第6期37-39,42,共4页 Coal Mine Modernization
关键词 地应力集中 围岩大变形 破碎围岩加固 主动支护 ground stress concentration Large deformation of surrounding rock Reinforcement of broken surrounding rock Active support
  • 相关文献

参考文献5

二级参考文献69

共引文献736

同被引文献5

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部