摘要
为解决木瓜煤矿10#煤层带压开采的问题,以10-100首采工作面为背景,综合运用理论分析、数值模拟及现场探测等方法,探讨工作面带压开采的安全性,验证采用底板注浆加固措施的可行性,设计具体的注浆方案,工程应用期间通过现场探测验证应用效果,成功实现了10#煤层的带压开采,对类似地质条件下工作面的安全开采具有重要借鉴意义。
In order to solve the problem of pressure mining in the 10#coal seam of Mugua Coal Mine,taking the 10-100 first mining face as a background,comprehensively using theoretical analysis,numerical simulation and on-site detection,etc.to discuss the safety of mining under pressure and verify the use of the bottom The feasibility of grouting reinforcement measures,designing a specific grouting plan,and verifying the application effect through on-site detection during engineering application,successfully realized the pressure mining of 10#coal seam,which has important reference significance for the safe mining of working face under similar geological conditions.
作者
荀庭龙
XUN Tinglong(Huozhou coal Power Group,Huozhou 031400,China)
出处
《煤矿现代化》
2020年第6期66-68,共3页
Coal Mine Modernization
关键词
带压开采
数值模拟
注浆加固
瞬变电磁法
Mining under pressure
numerical simulation
grouting reinforcement
transient electromagnetic method