摘要
针对陕蒙地区大采高工作面如何实现快速回撤安装,从前期回撤造条件、回撤安装工艺流程及优化、安撤队伍及车辆组织、现场组织及协调四个方面进行探讨。
Aiming at how to achieve rapid withdrawal installation in the high-mining working face in Shaanxi-Mongolia region,four aspects were discussed from the early withdrawal conditions,the withdrawal installation process and optimization,the safety withdrawal team and vehicle organization,site organization and coordination.
作者
史洋洋
朱森
SHI Yangyang;ZHU Sen(Xi'an Coal Mining Industry Engineering Co.,Ltd.(Comprehensive Machinery Safety Center),Zoucheng 273500,China)
出处
《煤矿现代化》
2020年第6期174-176,共3页
Coal Mine Modernization
关键词
陕蒙地区
大采高工作面
快速回撤安装
Shaanxi-Mongolia region
large mining height face
rapid withdrawal installation