摘要 在对天然气凝析液海底混输管道进行清管时,清管段塞会对下游的生产工艺流程产生一定的冲击。通过采用OLGA软件对某海管不同输量工况下管输压降及管内滞液量进行预测,制订出如下清管方案:在清管前通过增加生产井数量或调大采油树油嘴以增加海管的输量,降低管内的滞液量;清管器发出后,再关闭部分生产井或减小油嘴开度,以减慢清管器的行驶速度,从而减小管内积液,达到减小清管段塞和延长清管段塞泄放时间的目的。研究表明:该方案可将段塞容积减小至58 m^3,同时段塞流量降低至以平均输量工况清管时的45%,满足了段塞容积小于平台上段塞流捕集器的有效储存容积(60 m^3)的要求。 During pigging operation of multiphase subsea pipelines containing natural gas condensate,pigging slug will result in certain impact on the process of pipeline downstream production process.Taking an subsea pipeline as an example,the pressure drop and the liquid hold in the pipeline were predicted by OLGA software under different flowrate conditions,a pigging scheme was determined,that is,increase the number of production wells or enlarge the oil nozzle of the oil production tree before pipeline pigging to increase subsea pipeline throughput;some production wells are closed or the nozzle opening is reduced after the pig being dispatched;so as to slow down the pig running speed,thus reducing the liquid accumulation in the pipeline and the pigging slug and prolonging the discharge time of the pigging slug.It is indicated that the slug volume can be reduced to 58 m^3,and the slug flow rate can be reduced to 45%of that in average throughput condition,which satisfies the requirement that the slug volume is less than the effective storage volume(60 m^3)of the slug collector on the platform.
作者 李鹏程 唱永磊 颜筱函 李根 臧洪龙 LI Pengcheng;CHANG Yonglei;YAN Xiaohan;LI Gen;ZANG Honglong(China Offshore Oil Beijing Research Center,Beijing,100028,China;Qingdao Oasis Environmental and Safety Technology Co.,Ltd.,Qingdao 266000,China)
出处 《石油工程建设》 2020年第5期5-7,共3页 Petroleum Engineering Construction
基金 国家科技重大专项课题“深水油气田流动安全保障技术”(2016ZX05028-004)。
关键词 海底混输管道 清管方案 段塞容积 OLGA软件 multiphase subsea pipeline pigging scheme slug volume OLGA software
  • 相关文献

参考文献8

二级参考文献35

  • 1王冰.段塞流捕集器的结构设计分析[J].石油工程建设,2009,35(S1):165-166. 被引量:2
  • 2李晓平,宫敬,沈建宏.立管严重段塞流控制方法实验研究[J].中国海上油气(工程),2005,17(6):416-420. 被引量:16
  • 3安维杰,蔡振东,汪沛泉.海洋石油工程设计指南[M].北京:石油工业出版社,2007.
  • 4杨思明,曹砚峰,张晖.涠洲6-9/6-10/ll一2油田开发ODP编制报告[R].北京:中国海洋石油总公司研究总院,2010.
  • 5刘伟,朱国金,张立敏.锦州25—1油田南区开发ODP编制报告[R].北京:中国海洋石油总公司研究总院,2010.
  • 6AID AN O7 Donoghue. Pigging as a flowassurance solution 一 avoiding slug catcheroverflow [C] - PPSA Conference,Aberdeen,England,November 19-21,2005.
  • 7WU H L,SPRONSEN G Van. By-pass pigsfor liquid management in a two - phase flowpipeline [C]. 9th International Conference onMultiphase Production,Cannes, France,June16-18,1999.
  • 8WU H L’SPRONSEN G Van. By-pass pigpasses test for two - phase pipelines [ J ]..Oil&GasJoin-hal,1996,94(42):73-77.
  • 9ASUN Entaban,AJEMI IsmaU,MAHMUDJambari. By - pass pigging : a ’simple’.gy with significant business impact[C] . International Petroleum TechnologyConference,Beijing,China,March 26 - 28,2013.
  • 10张城,路小峰,舒昌成,等.天然气管道运行规范:SY/T5922-2012[S].北京:中国计划出版社,2012:6.

共引文献63

同被引文献38

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部