摘要
采用数据分析技术,根据概算批复文件,分析车陂路隧道沉管段的成本数据。在清晰划分沉管隧道项目组成结构的基础上,运用帕累托分析法对沉管隧道众多的造价构成单元进行分析,指出沉管隧道造价管理工作中需重点关注的A类项目组成要素。对车陂路隧道沉管段的工程费用进行以人工费、材料费和机械费为基础的全费用分解,并在基础上进一步确定影响沉管隧道造价的核心费用要素。
Using data analysis technology,according to the budget estimation approval document,this paper analyzes the cost data of Chebei road immersed tunnel.Based on the clear division of the composition structure of immersed tunnel projects,applies the Pareto analysis method to analyze the numerous cost components of immersed tunnels,and points out the type A project elements that should be focused on in the cost management of immersed tunnels.Then,decomposes the engineering cost of Chebei road immersed tunnel on the basis of labor cost,material cost and mechanical cost,and further determines the core cost elements affecting the cost of immersed tunnels.
作者
陈文旭
张文剑
CHEN Wenxu;ZHANG Wenjian(Traffic Project Management Center of Guangzhou Central District,Guangzhou 510340,China;Guangzhou Municipal Engineering Design and Research Institute Co.,Ltd,Guangzhou 510060,China)
出处
《工程经济》
2020年第9期29-31,共3页
ENGINEERING ECONOMY
基金
车陂路-新滘东路隧道工程(黄埔大道至新港东路)《沉管隧道成本大数据分析及预控》科研课题(GTCC2019(W)-023)。
关键词
沉管隧道
造价管理
帕累托法则
项目组成
费用要素
immersed tunnels
cost management
Pareto rule
project composition
cost elements