摘要
对比水电站发电前运行管理单位的三种参建模式,对建管结合这种模式在参建深度、切入时机等方面进行了深入尝试,总结出一套成熟有效的参建管理方案,为水电企业进一步优化建设方案、提高运行稳定性提供参考和借鉴。
Three different modes for the operation and management units to participate in the construction of hydropower projects before the power generation are compared.Specifically,the construction and management combination mode is discussed in depth,including the participation depth and the entry timing.An effective participation scheme is then summarized,which could be useful reference for hydropower projects to further optimize construction schemes and improve operational stability.