摘要
探讨在油漆厂家新颜色开发完成后,通过试验提前验证涂料性能,掌握最佳喷涂环境及参数要求,得到高质量的漆膜外观,规避涂装现场出现色差问题,缩短新颜色的调试周期。
Discuss that after the paint manufacturer’s new color development is completed,verify the performance of the coatings in advance through experiments,and master the best spraying environment and parameter requirements,obtain a high-quality paint film appearance,avoid color difference problems on site,and shorten the debugging cycle of the new color.
作者
李刚
霍鹏
Li Gang;Huo Peng(Technical Center of Great Wall Motor Co.,Ltd.,Automotive Engineering Technology Research Center of Hebei Province,Baoding Hebei,071000,China)
出处
《上海涂料》
CAS
2020年第5期35-39,共5页
Shanghai Coatings
关键词
新颜色
色差
调试周期
new color
color difference
debugging cycle