摘要
水电站机电设备成套模式因具有多种优势广受海外业主认可,本文对其优势、执行方式、项目风险等方面进行了分析,为今后执行该类型项目提供一定的参考。
The complete set of electromechanical equipment for hydropower station has been widely accepted by overseas owner for its advantages.This paper analyzes the advantages,execution mode and project risks for it,providing reference for implementation of similar project in the future.
作者
舒适
SHU Shi(PowerChina Zhongnan Engineering Corporation Limited,Changsha 410014,China)
出处
《价值工程》
2020年第29期81-82,共2页
Value Engineering
关键词
水电站
机电设备成套
执行方式
项目风险
hydropower station
complete set of electromechanical equipment
execution mode
project risk