浅谈阿尔塔什大坝工程项目科技创新管理及成效

Brief discussion on the scientific and technological innovation management and results of Altash Dam Project
下载PDF
导出
摘要 大型水利水电工程投资规模大、建设地域偏僻、地形地貌复杂、工艺繁多,建设过程中需要攻克众多技术难题,对项目的科技管理工作提出了较高的要求。在阿尔塔什大坝工程建设过程中,以“高寒地区深厚覆盖覆层高面板砂砾石坝施工技术”为总课题,梳理科研计划、建立研究体系、明确研究流程、制定管理办法,实现了项目科技创新管理工作的高质量开展,达成了各项科研课题的研究目标,可供相关工程项目科技创新管理工作参考。 Large-scale water conservancy and hydropower projects are characterized by large investment scale,remote construction areas,complex landforms and ground features as well as various technologies.Many technical problems should be overcome in the construction process,thereby putting forward higher requirements for the scientific and technological management of the project.“Gravel dam construction technology of deep overburden layer panel in cold areas”is regarded as the subject during the construction of the Atlash Dam for combing scientific research plan,establishing the research system,making clear the study process and formulating management measures.The management of science and technology innovation projects is carried out with high quality.The study goals of various research projects can be reached,thereby providing a reference for the relevant science and technology innovation project management work.
作者 巫世奇 石永刚 余义保 WU Shiqi;SHI Yonggang;YU Yibao(Sinohydro Bureau 5 Co.,Ltd.,Chengdu 610000,China)
出处 《水利建设与管理》 2020年第9期1-4,共4页 Water Conservancy Construction and Management
关键词 大型水利工程 阿尔塔什大坝 科技创新 管理 成效 large-scale water conservancy project,Altash Dam scientific and technological innovation management results
  • 相关文献

参考文献7

二级参考文献26

共引文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部