荣泰矿综采工作面内废弃井筒注浆加固技术研究 被引量:2

Study on grouting and reinforcement technology of abandoned shaft in Rongtai Mine Comprehensive Mining Face
下载PDF
导出
摘要 为避免造成井筒透水事故,安全顺利通过综采工作面内废弃井筒,提出并实施了分层注浆加固技术方案,超前打钻向井筒上方及周围注浆加固,制造人工假顶,增强井筒内壁强度,控制井筒内黄土及石块下沉。结果表明,通过分层注浆加固,解放了废弃井筒的保护煤柱,减少了搬家倒面次数,创造了50万元的间接经济效益和安全效益,确保了综采工作面安全高效地回采。 In order to avoid the shaft permeability accident and pass the abandoned shaft in the fully mechanized working face safely and smoothly,the layered grouting and reinforcement technical scheme was proposed and implemented,drilling in advance to grout and reinforce the shaft above and around,artificial false roof was created,the strength of the inner wall of the shaft was enhanced,and the sinking of loess and stones in the shaft was controlled.The results showed that through the layered grouting reinforcement,the abandoned shaft's protective coal column was liberated,the number of times of moving and pouring faces was reduced,which created an indirect economic and safety benefit of 500,000 Yuan and ensured the safe and efficient recovery of the comprehensive mining face.
作者 魏树群 武剑 Wei Shuqun;Wu Jian(Shanxi Jizhong Energy Group,Taiyuan 030032,China)
出处 《煤炭与化工》 CAS 2020年第9期24-25,共2页 Coal and Chemical Industry
关键词 废弃井筒 注浆加固 人工假顶 abandoned shaft grouting reinforcement artificial false ceiling
  • 相关文献

参考文献3

二级参考文献8

共引文献8

同被引文献9

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部