摘要 重要市政给水管修复常受制于交通、环境等因素,需要采取非开挖施工工艺。深圳东湖水厂-笔架山水厂原DN1200预应力混凝土原水管反向供水修复工程,采用DN1000钢管内穿方案。介绍了非开挖工法的技术经济比选、核心工艺流程、牵引工作坑设置和牵拉力等关键施工技术参数的确定,以及施工过程若干技术问题的处理措施,可以为穿插法应用于大口径钢管与刚性管道之间、超过3 km长距离非开挖修复提供工法启示和指引。 The rehabilitation of important municipal water supply pipes is often subject to traffic,environment and other factors,thus trenchless rehabilitation construction method is required.The DN1000 steel pipe slip lining scheme was adopted in the reverse water supply rehabilitation project of the original DN1200 prestressed concrete from Donghu water treatment plant(WTP)to Bijiashan WTP in Shenzhen.The technical and economic comparison,the core technological process,the working pit setup,the determination of key construction parameters such as traction force as well as the measures to deal with some technical problems in trenchless construction process were introduced,which could provide enlightenment and guidance for application of slip lining in trenchless rehabilitation between large diameter steel pipe and rigid pipe and for over 3 km distance.
作者 张叮叮 ZHANG Ding-ding(Shenzher Waer<Group>Co.Ld.,Shenzhen 518031,China)
出处 《中国给水排水》 CAS CSCD 北大核心 2020年第16期121-125,共5页 China Water & Wastewater
关键词 大口径给水管 非开挖修复 刚性管 穿插法 large-diameter water supply pipe trenchless rehabilitation rigid pipeline slip lining
  • 相关文献

参考文献2

二级参考文献3

共引文献11

同被引文献17

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部