浅谈尾矿库排洪系统穿越塌方冒顶区域施工方法

Discussion on the Construction Method of Tailing Reservoir Flood Drainage System Passing through the Area of Collapse and Roof Fall
下载PDF
导出
摘要 云南鹤庆北衙核桃箐尾矿库建设项目从上游至下游主要构筑物依次有拦洪坝、隧洞、尾矿堆坝、初期坝、集液池、拦污坝及回水设施等,本项目为尾矿库场外排洪隧洞工程。分析了鹤庆北衙核桃箐尾矿库场外排洪4#隧洞的工程地质和水文地质条件、穿越塌方冒顶区域总体施工思路及施工方法等,以期对类似尾矿库场外排洪系统的建设提供参考。 From upstream to downstream,the main structures of Hetaoqing tailing pond construction project in Beiya,Heqing County,Yunnan Province include flood detention dam,tunnel,tailings dam,initial dam,liquid collecting pool,trash dam and backwater facilities.The project is a flood discharge tunnel outside the tailings pond.This paper analyzes the engineering geological and hydrogeological conditions of No.4 tunnel of Hetaoqing tailing pond in Beiya,Heqing,and the overall construction ideas and construction methods for crossing the collapse and roof fall area,so as to provide reference for the construction of similar off-site flood discharge system of tailings pond.
作者 钟猛 Zhong Meng(Zhejiang Tunnel Engineering Group Co.,Ltd.,Hangzhou Zhejiang 310030,China)
出处 《西部探矿工程》 CAS 2020年第11期201-203,206,共4页 West-China Exploration Engineering
关键词 尾矿库 排洪系统 管棚工作室 管棚套拱 锚杆 tailings pond flood drainage system pipe shed workshop pipe shed arch anchor rod
  • 相关文献

参考文献2

二级参考文献3

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部