220 kV变电站主变安装质量控制分析及关键点管理研究

Quality Control Analysis and Key Point Management Research of Main Transformer Installation in 220 kV Substation
下载PDF
导出
摘要 当今时代,国民经济快速发展,工业化与城镇化稳步推进,电力负荷随之节节攀高。主变压器作为变电站的核心设备,是电能供应环节的原动力,关乎企业经济命脉。本文针对变电站主变安装环节的工序,以及关键点提出了相应的管理措施,旨在强化安装技术和安装质量,确保变电站的安全稳定运行,促进电力可持续发展。 In today’s era,with the rapid development of the national economy,industrialization and urbanization are progressing steadily,and the power load is steadily increasing.As the core equipment of the substation,the main transformer is the driving force of the electric power supply link.Its installation project is a key project of the power supply enterprise and is related to the economic lifeline of the enterprise.This article proposes corresponding management measures for the installation process and key points of the main transformer substation,aiming to strengthen the installation quality from the aspects of installation technology and engineering management,ensure the safe and stable operation of the substation,and promote the sustainable development of power.
作者 叶国权 Ye Guo-quan
出处 《电力系统装备》 2020年第17期153-154,共2页 Electric Power System Equipment
关键词 220 kV变电站 主变安装 质量控制 关键点管理 220 kV substation main transformer installation quality control key point management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部