期刊文献+

深圳地铁不同减振等级预制板轨道施工综述 被引量:4

Summary of the Construction of Precast Slab Tracks with Different Vibration Reduction Levels in Shenzhen Metro
下载PDF
导出
摘要 目前,地铁建设中主要使用现浇混凝土整体道床,存在人工作业量大、工序繁琐、精度不易控制等缺点;而预制板轨道具有精度较高、施工效率高等优点。基于深圳地铁6号线大规模应用不同减振等级预制板轨道的工程背景,对深圳地铁6号线铺设的不同减振等级预制板轨道进行调研,系统介绍普通及中等减振预制板轨道、高等减振预制板轨道、特殊减振预制板轨道的施工工艺。并针对预制板轨道施工过程中出现的限位凸台预埋钢筋混凝土保护层厚度不够、橡胶隔振垫浮置板轨道中橡胶隔振垫与混凝土基底脱空、混泥土基底表面整修等问题提出处理建议。研究成果可为优化地铁预制板轨道施工工艺、减少轨道病害、提高施工效率提供参考。 Cast-in-place concrete monolithic track is mainly used in metro construction currently which has disadvantages such as large amount of manual work,complicated procedures and low construction precision;while the precast slab track has advantages of high precision and construction efficiency. Based on the engineering background of the large-scale applications of precast slab tracks with different vibration reduction grades on Shenzhen Metro Line 6,the construction of precast tracks for medium grade,high grade and special grade of vibration reduction levels are investigated and systematically introduced. Besides,suggestions are proposed to solve problems such as insufficient concrete cover for track stoppers,separation of damping pad and concrete base and refurbishment of concrete base surface. The results provide references for the optimization of construction technology of the precast slab track,reduction of railway track diseases and improvement of construction efficiency.
作者 蒋建政 周华龙 刘锦辉 周昌盛 Jiang Jianzheng;Zhou Hualong;Liu Jinhui;Zhou Changsheng(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China;ShenZhen Subway Group Co.,Ltd.,Shenzhen 518026,China)
出处 《铁道勘察》 2020年第5期114-119,共6页 Railway Investigation and Surveying
基金 中铁二院工程集团有限责任公司科技研究计划重点课题(KYY2017021)。
关键词 地铁 施工工艺 施工现场 预制板轨道 减振 Metro Construction technology Construction site Precast slab track Vibration damping
  • 相关文献

参考文献14

二级参考文献76

共引文献230

同被引文献44

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部