摘要 核电厂发电机抽转子是设备解体过程中的关键步骤,具有作业难度大、工艺复杂、多专业协作的特点。文章以某核电厂1号机组发电机首次解体为例,设计专用工具优化厂家原设计抽芯方案,减少1台行车的使用,缩短大修工期,并总结抽转子过程中需要注意的关键点,确保抽转子过程中的设备安全,具有借鉴意义。 Pulling out the generator rotor in nuclear power plant is a key step in the process of equipment disassembly,which has the characteristics of difficult operation,complex process and multi-disciplinary cooperation.Taking the first disassemblyof the generator of Unit 1 in a nuclear power plant as an example,the special tools for optimizing the original design of pulling rotor out scheme was designed,which reduce the use of one crane and shorten the overhaul period.The relevant precautions should be paid attention to in the process of pulling out the rotor was summarized,so as to ensure the safety of the equipment in the process,which hadreference significance.
作者 崔晓雷 沈和彪 CUI Xiaolei;SHEN Hebiao(Sanmen Nuclear Power Co.,Ltd.,Sanmen 317100,China)
出处 《电工技术》 2020年第18期55-57,共3页 Electric Engineering
关键词 核电厂 发电机 抽转子专用工具 nuclear power plant generator special tools for pulling out the rotor
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部