期刊文献+

大盾构隧道混凝土管片生产信息化技术 被引量:3

Information Technology of Concrete Segment Production in Large Shield Tunnel
下载PDF
导出
摘要 文中阐述运用信息化物联网技术于大盾构隧道混凝土管片生产工艺流程。将全生产流程、混凝土拌和站、产品制造流水线、温控设备等生产质量控制信息数据、应用手持信息通讯设备进行实时采集、流通交换和控制屏显示,完善生产管控全过程的数据通讯。信息化技术同时运用于管片出厂后的运输、拼装等环节中,实现管片产品质量的可追溯性、动态库存管理和拼装定位追踪,实现管片的全生命周期质量管控。 This paper describes the application of information internet of things technology in large shield tunnel concrete segment production process.The production quality control information data of the whole production process,concrete mixing station,product manufacturing line,temperature control equipment and other production quality control information data are collected,circulated and exchanged by hand-held information communication equipment,and the data communication in the whole process of production control is improved.At the same time,information technology is applied to the transportation and assembly of segments after delivery,so as to realize the traceability of segment product quality,dynamic inventory management and assembly positioning tracking,and realize the quality control of segment in the whole life cycle.
作者 胡云发 董贺祥 Hu Yunfa;Dong Hexiang(China Railway 14th Bureau Group Fangqiao Co.Ltd.,Beijing 102400;SFRC Engineering,Yokohama 216-0015,Japan)
出处 《江西建材》 2020年第9期19-20,22,共3页 Jiangxi Building Materials
关键词 盾构管片 信息化 物联网 生产管理 Shield segment Informatization The Internet of things
  • 相关文献

参考文献2

二级参考文献25

  • 1胡珉,陆俊宇.基于RFID的预制混凝土构件生产智能管理系统设计与实现[J].土木建筑工程信息技术,2013,5(3):50-56. 被引量:20
  • 2彭世杰.地铁施工中钢筋混凝土管片的生产技术[J].建筑科学,2008(16):69-70.
  • 3Vaeharapoom Benjaoran, Nashwan Dawood. Intelligence approach to production planning system for bespoke pre- cast concrete products ,Automation in Construction 15 (20 06 ) 737-745.
  • 4L. Bell, B. Williams. Resources and field technology for sign management system implementation, Proceedings of Construction Research Congress 2003, ASCE, March 19-21, Held in Honolulu, Hawaii, 2003.
  • 5R. Navon, O. Berkovich. Development and on-site evalua- tion of an automated materials management and control model ,J. Constr. Eng. Manage. 131 (12) (2005) 1328-1336.
  • 6T. Shehab, O. Moselhi. An automated barcode system for tracking and control of engineering deliverables, Proceed- ing of Construction Research Congress 2005, April 5-7, Held in San Diego, CA, 2005.
  • 7G. Saeed, A. Brown, M. Knight, M. Winchester. Delivery of pedestrian real-time location and routing information to mobile architectural guide, Autom. Constr, 2010,19 ( 4 ) : 502-517.
  • 8谈永泉,杨鼎宜,俞峰,许晓东.我国预制混凝土衬砌管片生产技术及标准现状[J].混凝土与水泥制品,2011(2):25-30. 被引量:22
  • 9贺朝荣.浅谈地铁管片生产质量控制[J].城市道桥与防洪,2011(1):95-98. 被引量:9
  • 10李犁,邓雪原.基于BIM技术的建筑信息平台的构建[J].土木建筑工程信息技术,2012,4(2):25-29. 被引量:92

共引文献15

同被引文献43

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部