复杂海相地质条件下的咬合桩施工关键技术 被引量:5

Key Technology of Secant Pile Construction Under Complex Marine Geological Conditions
下载PDF
导出
摘要 为解决复杂地质条件下的咬合桩施工难题,以深圳城市轨道交通13号线深圳湾口岸站—登良东站明挖区间围护桩施工为载体,在保证质量、安全等基本前提下,通过科学管理、设备合理组合、优化混凝土配比和工艺改进等措施,形成了沿海城市复杂海相地质条件下的咬合桩施工关键技术。该技术可为类似工程提供借鉴。 In order to solve the problem of secant pile construction under the complicated geological conditions,taking the support pile construction in the open excavation section between Shenzhen Bay Port Station and Dengliang East Station of Shenzhen rail transit line 13 as the carrier,under the basic premise of ensuring the quality and safety,and through the measures of scientific management,reasonable combination of equipment,optimization of concrete ratio and process improvement,the key construction technology of secant pile under the complicated marine geological conditions in the coastal cities is formed,which can provide a reference for similar projects.
作者 罗光财 戴华良 曹勇 朱嘉岚 LUO Guangcai;DAI Hualiang;CAO Yong;ZHU Jialan(China Construction Fifth Engineering Division Corp.,Ltd.,Changsha,Hunan 410004,China)
出处 《建筑施工》 2020年第9期1606-1609,共4页 Building Construction
关键词 咬合桩 施工技术 海相地质 超缓凝混凝土 secant pile construction technology marine geology super retarding concrete
  • 相关文献

参考文献8

二级参考文献16

共引文献88

同被引文献15

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部