期刊文献+

新型吊装系统在超高异形幕墙吊装施工中的综合应用 被引量:2

Comprehensive Application of New Hoisting System in Hoisting Construction of Super-high Special-shaped Curtain Wall
下载PDF
导出
摘要 异形幕墙在施工安装过程中有一定的难度及风险系数,因此对其吊装的安全性及可靠性有更高的要求。依托上海世博地区A13A-01地块新建营业办公楼项目,论证了3套新型吊装系统的安全性与可靠性,并在实际施工过程中得到了很好的验证。总结的成功经验可为类似工程参考。 Special-shaped curtain wall has certain difficulty and risk coefficient in the process of construction and installation,which shows higher requirements for the safety and reliability of hoisting.Based on the project of new business office building in A13A-01 plot of Shanghai World Expo area,the safety and reliability of three sets of new hoisting system are demonstrated,which has been well verified in the actual construction process.The successful experience can be used as reference for similar projects.
作者 崔恒德 CUI Hengde(Shanghai Construction No.2(Group)Co.,Ltd.,Shanghai 200090,China)
出处 《建筑施工》 2020年第9期1684-1686,共3页 Building Construction
关键词 超高异形幕墙 吊装系统 试验研究 可行性论证 super-high special-shaped curtain wall hoisting system experimental research feasibility study
  • 相关文献

参考文献3

二级参考文献8

共引文献21

同被引文献14

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部