文章介绍了赤峰金剑铜业有限责任公司铜冶炼工艺升级搬迁改造项目熔炼区域85t桥式起重机在安装过程中的施工技术及步骤,着重强调了施工过程中吊车的选择,以及走台侧主梁、导电侧主梁、主小车、副小车等重型物件的吊装方法。
This paper introduces the construction technology and steps of the 85t bridge crane installation in the smelting area of the copper smelting process upgrading,relocation and renovation project of Chifeng Jinjian Copper Industry Co.,Ltd.,and emphasizes the crane selection in the construction process,as well as the hoisting methods of the main beams at the walking platform side and conduction side,the main and auxiliary trolleys,and other heavy items.
作者
杜喜喜
李汇
代亮
Du Xixi;Li Hui;Dai Liang(China 15th Metallurgical Construction Group Co.,Ltd.,Wuhan 430075,China)