期刊文献+

独塔混合梁斜拉桥采用缝接合龙法的施工控制技术 被引量:1

Construction control technology of single-tower mixed beam cable-stayed bridge with seam joint method
下载PDF
导出
摘要 文章以某大桥为工程实例,对独塔混合梁斜拉桥施工技术和施工流程进行研究,施工过程中主要采用掌控合龙缝的合龙思路,从而使得施工步骤清晰,合龙的操作难度降低,最终保证了合龙段施工质量。 This article takes a bridge as an example to study the construction technology and construction process of a single-tower mixed beam cable-stayed bridge. The construction process mainly adopts the idea of controlling the closure of the closure joint, so that the construction steps are clear, and the operation difficulty of closure is reduced, and finally guarantee the construction quality of the closure section.
作者 武益辉 WU Yihui(Chongqing Beixin Rongjian Construction Engineering Co.,Ltd,Chongqing 404700,China)
出处 《中国高新科技》 2020年第16期51-52,共2页
关键词 混合梁斜拉桥 缝接合龙法 桥梁施工 mixed beam cable-stayed bridge seam joint method bridge construction
  • 相关文献

参考文献2

二级参考文献15

共引文献17

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部