地质“三边”工作贯穿于地质勘探工程的全过程,适用于不同的勘查阶段。在煤田地质勘探中,地质“三边”工作涉及到原始资料的审查与校对、图件绘制、正式成果材料、勘查设计优化变更、工程布置的调整等内容。及时有效的地质“三边”工作,可以解决地质工作和勘探工作严重脱节的情况,还可以指导地质勘探工程的实施,以推测科学合理及见效快的优势被广泛的应用。
The geological"three simultaneousness"work(analyzing the exploration results,modifying the de⁃sign scheme,and guiding the next exploration work)runs through the whole process of geological explora⁃tion engineering and is applicable to different exploration stages.In the coal exploration,the geological"three simultaneousness"work involves the examination and proofreading of original data,drawing of maps,official achievement materials,optimization and change of exploration design,adjustment of engineering lay⁃out,etc.Timely and effective geological"three simultaneousness"work can solve the serious disconnection between geological work and exploration work,and can also guide the implementation of geological explora⁃tion engineering.It has been widely applied by virtue of its scientific and reasonable inference and quick ef⁃fect.
作者
唐聪亮
任英举
周光
Tang Congliang;Ren Yingju;Zhou Guang(CHN Energy Ningxia Coal Industry Group Energy Engineering Co.,Ltd.Environmental Safety Engineering Branch,Yinchuan,Ningxia,750011)
出处
《能源科技》
2020年第8期21-23,共3页
Energy Science and Technology
基金
国家重点研发计划资助项目(2018YFC0808206)。
关键词
地质“三边”工作
地质勘探工程
应用
geological"three simultaneousness"work
geological exploration engineering
application