地铁工程进度管理与控制措施 被引量:2

Metro Project Schedule Management and Control Measures
下载PDF
导出
摘要 地铁工程是一项规模庞大且错综复杂的工程,它不仅包括地下、地面建筑,还包括桥梁、隧道等工程,其所涉及的专业多、外围条件复杂,所以对地铁工程进度管理提出了更高的要求。而土建工程施工进度则直接关系到通车目标的实现,因此,其成为地铁工程进度管理的重点。本文立足于地铁工程进度管理,着重对土建工程进度指标、工程进度影响因素及控制措施进行分析,以期为后续线路建设管理提供参考。 The subway project is a large-scale and intricate project.It includes not only underground and ground buildings,but also bridges,tunnels and other projects.It involves many specialties and complex peripheral conditions.High demands.The construction progress of civil engineering is directly related to the realization of the goal of opening to traffic,so it has become the focus of subway project progress management.Based on the subway project schedule management,this article focuses on the research and analysis of civil engineering schedule indicators,project progress influencing factors and control measures,with a view to providing reference for subsequent line construction management.
作者 贺芬 HE Fen(Nanjing Metro Construction Co.,Ltd.,Nanjing Jiangsu210019,China)
出处 《北方建筑》 2020年第5期73-77,共5页 Northern Architecture
关键词 地铁工程 进度管理 控制措施 subway project schedule management control measures
  • 相关文献

参考文献4

二级参考文献16

共引文献28

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部