上海市昆阳路工程穿越黄浦江防汛墙施工时,桥梁底部承台部分侵入陆域控制线内,对防汛墙安全存在一定影响。针对工程对黄浦江行洪安全影响,采用不同有限元分析软件,研究工程施工期对黄浦江防汛墙安全影响,并结合施工过程中实测数据,验证研究结果可靠性,用于指导设计。
During the construction of Shanghai Kunyang Rd.Project crossing the Huangpu River flood control wall,the part of the bridge bottom platform has intruded into the land control line,which has a certain impact on the safety of the flood control wall.In view of the project influence on the flood safety of Huangpu River,different finite element analysis software is used to study the safety impact of the project construction period on the flood control wall of Huangpu River.Combined with the measured data in the construction process,the reliability of the research results is verified to guide the design.
作者
卞彬
丁星星
BIAN Bin;DING Xing-xing(Shanghai Urban Construction Design&Research InstituteCo.,Ltd.,Shanghai 200125,China;Shanghai Municipal Engineering Design&Research InstituteCo.,Ltd.,Shanghai 200092,China)
出处
《中国市政工程》
2020年第5期31-33,114,共4页
China Municipal Engineering
关键词
越江工程
有限元
防汛墙
cross-river project
finite element