摘要
文章以某个非洲水电站项目为例来说明国际水电站工程设计中采用IEEE-485标准对直流负荷如何进行分类、如何绘制负荷周期图以及采用容量换算表来计算厂房一体化蓄电池容量并进行直流电源系统设备的选择。
This article takes an African hydropower project as an example to illustrate how to classify DC loads in accordance with IEEE-485 standards in the engineering design of international hydropower stations,how to draw load cycle diagrams,and how to calculate the capacity of the integrated battery in the powerhouse and select DC power system equipment with capacity conversion tables.
作者
张锋利
何苗
ZHANG Fengli;HE Miao(Powerchina Northwest Engineering Corporation Limited,Xi'an 710065,China)
出处
《西北水电》
2020年第S01期82-84,共3页
Northwest Hydropower