摘要
从基础数据编辑的角度出发,对首趟列车添乘应关注的项点进行归纳分析,并辅以鲜明的案例。指出了关键项验证方法,对做好首趟列车添乘工作有较大帮助。
From the point of view of basic data preparation,the points of concern about the first train operation after the end of line construction are analyzed and summarized.Meanwhile,the verification methods of the key points of the first train operation after the end of line construction is also given with the support of vivid cases,which can help do the first train operation well.
出处
《铁道通信信号》
2020年第9期36-38,共3页
Railway Signalling & Communication
关键词
首趟列车添乘
关键项点
列车运行监控记录装置
First train operation after end of line construction
Key points
LKJ device.