摘要
以工程实例为基础,对水库砌石重力坝坝基开挖措施进行分析,得出施工人员应做好施工前的准备工作、确保基坑土方开挖的质量以及提高对建基面坑槽开挖的重视程度等对策,希望能在对水库砌石重力坝坝基处理的关键点进行简要探讨的同时,为有关人士提供更多帮助。
Based on an engineering example,this paper analyzes the excavation measures of the foundation of the masonry gravity dam of the reservoir,and concludes that the construction personnel should do a good job in preparation before construction,ensure the quality of the excavation of the foundation pit,and improve the importance of the excavation of the foundation pit.It is hoped that we can briefly discuss the key points of the treatment of the reservoir masonry gravity dam foundation and provide more help to the relevant people。
作者
邓次兵
DENG Ci-bing(Chenzhou Hydroelectric Construction Company,Chenzhou 423000,China)
出处
《工程建设与设计》
2020年第18期103-104,共2页
Construction & Design for Engineering
关键词
水库砌石
重力坝坝基
坝基开挖
基础处理
reservoir masonry
gravity dam foundation
dam foundation excavation
foundation treatment