解析燃气联合循环电站建设国际EPC项目总承包商的设计管理 被引量:2

Analysis of the Design and Management of International EPC Contractors on the Construction of Gas Combined Cycle Power Plant
下载PDF
导出
摘要 以马来西亚康诺桥燃气联合循环电站和凯德隆燃气联合循环电站项目为例,结合国际EPC项目的总承包设计管理实践,提出了在燃气联合循环电站EPC总承包项目的设计管理中应遵循的基本管理原则,并对设计管理实践中出现的通病进行了分析与经验总结,特别是针对国内外的设计差别引起的问题进行了一些梳理,为类似工程项目的实施提供了可以参考的借鉴。 Base on the case study of the Connaught Bridge Gas Combined Cycle Power Plant and the Bintulu Tanjung Kidurong Combined Cycle Power Plant Project(both in Malaysia),combined with the design management practice of the international EPC contractors,this thesis proposes the basic management principles which should be followed during the corresponding design management process for such projects,makes analyses and summary of experience towards the common faults during the design management practice stage,especially to the problems caused by the design difference between the domestic and overseas,aiming at providing reference value to the execution of similar projects.
作者 贺晓锋 HE Xiao-feng(Sinohydro Bureau 8 Co.Ltd.,Changsha 410004,China)
出处 《工程建设与设计》 2020年第18期203-207,共5页 Construction & Design for Engineering
关键词 燃气联合循环电站 EPC总承包项目 设计管理 gas combined cycle power plant EPC general contracting project design management
  • 相关文献

同被引文献8

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部