摘要 针对采用硫酸化焙烧—浸出—直接电积工艺处理高杂质硫化铜精矿时,杂质含量高,不能满足电积工艺要求的问题,通过在该工艺之前增加预浸出工序,预先脱除精矿中的部分主要杂质,避免或减少杂质对后续工序的影响。采用正交试验法研究了预浸过程中酸矿比、温度、时间和液固比对杂质Cu、Co、Fe、Mn浸出率的影响。在此基础上,采用单因素试验法进一步优化了工艺参数条件。结果表明,增加预浸出可以使焙砂浸出液中影响铜电积的主要杂质元素Fe、Mn、Co等含量降低,铜的整体浸出率增加;预浸出过程酸矿比对杂质元素浸出率的影响最大;较优预浸出工艺条件为:酸矿比0.4∶1、温度50℃、时间2h、液固比3∶1时,Cu的最终浸出率超过99%,焙砂浸出液中Fe、Mn含量分别为0.15g/L和0.005g/L。 In view of the problem that the content of impurities in high impurity copper sulfide concentrate cannot meet the requirements of electrowinning process when sulfuric acid roasting leaching direct electrowinning process is adopted,some main impurities in the concentrate are removed in advance by adding pre-leaching process before the process,so as to avoid or reduce the influence of impurities on the subsequent process.The effects of acid ore ratio,temperature,time and liquid solid ratio on the leaching rate of impurities Cu,Co,Fe and Mn were studied by orthogonal test.On this basis,the single factor test method was used to further optimize the process parameters.The results showed that with the increase of pre-leaching,the contents of main impurity elements such as Fe, Mn,Co,which affect copper electrowinning in calcine leaching solution can be reduced,and the overall leaching rate of copper can be increased;the acid ore ratio has the greatest influence on the leaching rate of impurity elements in the preleaching process.The optimum pre-leaching conditions are as follows:acid ore ratio 0.4∶1,temperature50 ℃,time 2 h,liquid solid ratio 3∶1,the final leaching rate of Cu is more than 99%,and the contents of Fe and Mn in calcine leaching solution are 0.15 g/L and 0.005 g/L,respectively.
作者 施友富 张正阳 杨永强 孙留根 SHI You-fu;ZHANG Zheng-yang;YANG Yong-qiang;SUN Liu-gen(China Nonferrous Metal Industry's Foreign Engineering and Construction Co.Ltd.,Beijing 100029,China;BGRIMM Technology Group,Beijing 100160,China)
出处 《矿冶》 CAS 2020年第5期84-87,118,共5页 Mining And Metallurgy
关键词 硫化铜 预浸出 预除杂 酸矿比 copper sulfide pre-leaching removing impurities acid ore ratio
  • 相关文献

参考文献6

二级参考文献46

  • 1张永德,李皊值,阮仁满.黄铜矿的湿法冶金工艺研究进展[J].稀有金属,2005,29(1):83-87. 被引量:17
  • 2.[A]..[C].,..
  • 3.[A]..[C].,..
  • 4Brierley J A, Brierley C L. Present and future commercial applications of biohydrometallurgy [J]. Hydrometallurgy 2001, 59(2) : 233.
  • 5Mal Jansen, Taylor. Key elements in the selection of sulphide leach processes for copper concentrate leaching[ A]//Alta Cu 2000[C]. August 2000:1.
  • 6Baba A A, Ayinla K I, Adekola F A, et al. A Review on Novel Techniques for Chalcopyrite Ore Processing[ J]. International Journal of Mining Engineering and Mineral Processing, 2012, 1 ( 1 ) : 1 - 16.
  • 7Prasad S, Pandey B D. Alternative processes for treatment of chalcopyrite--a review[ J ]. Minerals Engineering, 1998, 11 (8) : 763 -781.
  • 8Gulfen M, Aydin A O. Dissolution of copper from a primary chalcopyrite ore calcined with and without Fe203 in sulphuric acid solution[J]. Indian Journal of Chemical Technology, 2010, 17 ( 2 ) : 145 - 149.
  • 9Prasad S, Pandey B D, Palit S K. Sulphation of chalcopyrite with steam and oxygen in the presence of some additives [J]. Materials transactions - JIM, 1996, 37 : 1304 - 1310.
  • 10Burdick C L, Ellis J H. The crystal structure of chalcopyrite determined by X- rays[ J]. Journal of the American Chemical Society, 1917, 39(12) : 2518 -2525.

共引文献66

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部