期刊文献+

新建热水器生产车间项目总平面布局研究

Research on General Layout of New Building Water Heater Production Workshop Project
下载PDF
导出
摘要 随着人民生活水平不断提高,农村城镇化、大中型城市全域城市化进程加快,家用热水器销量稳步上升。大型热水器制造企业通过新建生产基地,优化工艺布局,扩张产能。论文以某企业拟新建热水器生产车间项目为例,介绍了热水器生产工艺,探讨了本项目总平面布局的设计方案比选。 With the continuous improvement of people's living standards,rural urbanization,large and medium-sized cities in the region to accelerate the process of urbanization,domestic water heater sales rose steadily.Large-scale water heater manufacturers through building the new production base,and optimizing process layout to expand the capacity.This paper takes a new water heater production workshop project of an enterprise as an example,introduces the water heater production process,and discusses the design scheme comparison of the general layout of the project.
作者 王祥 范超众 孙玉萍 WANG Xiang;FAN Chao-zhong;SUN Yu-ping(First Design&Research Institute,MI China,Hefei 230601,China)
出处 《工程建设与设计》 2020年第21期152-154,160,共4页 Construction & Design for Engineering
关键词 家用热水器 生产工艺 总平面布局 domestic water heater production process general layout
  • 相关文献

参考文献1

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部